-
jcs44341-344
The
mobile robot has to find the optimal path which reduces the number of steps to be taken between the
starting point and the target ending point. GAs can overcome many problems encountered by
traditional search techniques such as the gradient based methods. The proposed controlling algorithm
allows four-neighbor movements, so that path-planning can adapt with complicated search spaces with
- 2010-03-11 11:45:29下载
- 积分:1
-
frft
FRFT算法实现程序,用分数阶傅里叶变换进行信号处理,得到对应的视频图(frft simulation using matlab)
- 2014-02-25 23:50:21下载
- 积分:1
-
image-matching
用matlab实现的图像匹配,配有目标图片和程序说明(Implemented with the image matching matlab, with a target picture and description of the procedures)
- 2010-10-13 13:16:20下载
- 积分:1
-
QPSK
QPSK的调制解调,跟书上的框图基本如出一辙,希望对大家有帮助。(QPSK modulation and demodulation, the basic block diagram of the book with the same, we want to help.)
- 2010-12-13 15:39:08下载
- 积分:1
-
ERWEIfdtd
TM波在二维自由空间的传播 PML边界 高斯源(TM wave propagation in two-dimensional PML boundary of free space Gaussian source)
- 2011-06-05 15:14:16下载
- 积分:1
-
matlab_programs
matlab programs of digital signal processing, useful for undergraduate engieers.
- 2011-08-20 15:19:33下载
- 积分:1
-
matlab-voice-lib
matlab语音工具包,里面一些语音处理的典型matlab算法(typical matlab matlab Voice Toolkit, which some of the voice processing algorithm)
- 2013-03-21 18:40:23下载
- 积分:1
-
Mercurial_The_Definitive_Guide
mercurial 分布式版本控制软件指南,方便个人和工程使用,使用方便(mercurial distributed version control software)
- 2013-08-11 17:33:24下载
- 积分:1
-
Texto-integral
Paper Abstract – An adaptive control of Distributed Generation (DG)
to provide predictable active power output at the primary
distribution substation is described. Often, distribution networks
accommodate renewable energy different energy sources
and thus using different energy conversion sources. As the
amount of generation that comes intermittent renewable
sources (e.g. wind energy) increases, network operators start to
concern with the uncertainty of generation. However, when the
power output intermittent renewable sources is predicted,
the network operators can reduce the operational costs of the
network and the DG owners may go on the market. Thus, our
challenge with this work was to develop an algorithm which can
predict the active power output the aggregation of wind and
biomass energy at the primary distribution substation of a typical
distribution network. Wind and biomass energy plant are onto
the same distribution network but not necessarily onto the same
feeder.
- 2014-12-04 00:36:38下载
- 积分:1
-
three_phase_current_loop_grid
Similations electrical networks with Control & current and active and reactive power
- 2015-01-29 00:26:03下载
- 积分:1