Paper Abstract – An adaptive control of Distributed Generation (DG) to provide predictable active power output at the primary distribution substation is described. Often, distribution networks accommodate renewable energy different energy sources and thus using different energy conversion sources. As the amount of generation that comes intermittent renewable sources (e.g. wind energy) increases, network operators start to concern with the uncertainty of generation. However, when the power output intermittent renewable sources is predicted, the network operators can reduce the operational costs of the network and the DG owners may go on the market. Thus, our challenge with this work was to develop an algorithm which can predict the active power output the aggregation of wind and biomass energy at the primary distribution substation of a typical distribution network. Wind and biomass energy plant are onto the same distribution network but not necessarily onto the same feeder.