-
比较器复用_DISABLE,自动触发源连续按键功能,主要是按键出发的方式功能,需要的下载吧...
比较器复用_DISABLE,自动触发源连续按键功能,主要是按键出发的方式功能,需要的下载吧-Comparators reuse _DISABLE, automatically trigger source for key functions, mainly the way the starting button functions, the need to download it
- 2022-08-11 19:54:30下载
- 积分:1
-
21-40example-c代码,是txt文本格式的,另有60例代码会陆续传上来。-21-40example-c code, txt text format. Another 60 cases will successively sent code onto.
- 2022-09-23 20:10:03下载
- 积分:1
-
thinkinc++(书,中文,源码),初学者必备的一本好书
thinkinc++(书,中文,源码),初学者必备的一本好书-thinkinc++ (books, Chinese, source), beginners must have a good book
- 2022-04-16 18:11:26下载
- 积分:1
-
并行openmp
说明: Openmp for parallel computing samples!!!
- 2020-06-22 09:40:06下载
- 积分:1
-
C语言实现的小型计算器
该程序是利用c语言编写的小型计算机软件程序,适合学完全部c语言的初级学者学习,用来提高自己的编程能力,其中包含有头文件,还有测试文件
- 2022-04-26 17:43:54下载
- 积分:1
-
[www.gigapurbalingga.com]_EUSDRWP1100
Software that can help u a lot
- 2018-03-29 05:59:59下载
- 积分:1
-
蚁群算法
说明: 蚁群算法是一种用来寻找优化路径的概率型算法。这种算法具有分布计算、信息正反馈和启发式搜索的特征,本质上是进化算法中的一种启发式全局优化算法。(Ant colony algorithm (ACO) is a probabilistic algorithm for finding optimal paths. This algorithm has the characteristics of distributed computing, positive information feedback and heuristic search. It is essentially a heuristic global optimization algorithm in evolutionary algorithm.)
- 2020-10-04 15:18:52下载
- 积分:1
-
chanpinzhiliang
通达OA工作流中产品质量检查报告流程设计(Mastery OA workflow product quality inspection report process design)
- 2009-01-20 15:57:27下载
- 积分:1
-
TupinAPSAR09
这个是Tupin教授在09年APSAR会议上做的近来相关高分辨率SAR图像处理的总结PPT,值得推荐。(This is a Professor in 2009 APSAR Tupin do on the recent meeting of high-resolution SAR image processing related to a summary of PPT, is recommended.)
- 2011-04-22 20:59:25下载
- 积分:1
-
基于供电网格优化划分的中压配电网规划思路和方法
提出了一套基于供电网格优化划分的中压配电网规划思路和方法。首先,确定规划区域主干通道布局,确保土地资源预留。然后,在明确网格划分目的和原则的基础上,基于就近选择负荷备供变电站和负荷聚类方法,实现供电网格在全局范围内的优化划分。最后,分别在各供电网格内,基于其供区分类优选接线模式和一、二次建设改造标准,并进行主干线布线规划。(This paper presents a set of ideas and methods for medium voltage distribution network planning based on power grid optimization. Firstly, the layout of the main corridors in the planning area is determined to ensure the reservation of land resources. Then, on the basis of defining the purpose and principle of grid partition, the optimal partition of power supply grid in the global scope is realized based on the near selection of load standby substation and load clustering method. Finally, in each power supply grid, based on the classification of supply areas, the optimal wiring mode and reconstruction standards of primary and secondary construction are selected, and the main wiring planning is carried out.)
- 2020-06-19 06:40:01下载
- 积分:1