登录
首页 » matlab » DataTxSim3x_2

DataTxSim3x_2

于 2013-03-30 发布 文件大小:9KB
0 91
下载积分: 1 下载次数: 1

代码说明:

  A Simple Digital Communication Receiver_2_

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • AsynchronousMachineModels
    各种异步电机模型,有abc坐标系ab0坐标系以及dq0坐标系下的模型(Various induction motor model, there are abc coordinates ab0 coordinates and coordinate system model dq0)
    2010-12-09 10:33:05下载
    积分:1
  • dirctDiff
    矢量图像的方向扩散matlab源码,用于图像滤波的方法(Direction diffusion of vector image,used for image filtering)
    2011-01-14 21:24:11下载
    积分:1
  • J6_2012--Kalman-interpolation
    卡尔曼滤波器进行信道估计的一篇文章,适用于OFDM-MIMO系统。(Kalman filter for channel estimation in an article for OFDM-MIMO systems.)
    2013-12-22 20:53:26下载
    积分:1
  • sjjjd
    三机九节点模型进行了动态稳定分析,应用三阶电机模型,通过对 实际系统的潮流计算、动态初值计算、解常微分方程、Matlab仿真(Three machine nine node flow calculation " " " " " " " " " " " " " )
    2013-06-07 16:39:02下载
    积分:1
  • Field-Flashing-Control
    针对采用自并励励磁系统的同步发电机组,对其建立机端电压的过程进行的仿真案例。(Study on the Field Flashing Control of Large Synchronous Generator)
    2021-03-15 16:19:22下载
    积分:1
  • matlab.rar
    《精通matlab》 联合开发网 - pudn.com
    2007-11-07 15:30:15下载
    积分:1
  • Astar
    MATLAB IMPLEMENTATION OF ASTAR ALGORITHM
    2010-11-23 02:38:56下载
    积分:1
  • Slam-2DD
    2Dimension of SLAM asks the following question: “Is it possible for an autonomous vehicle to start in an unknown location in an unknown environment and then to incrementally build a map of this environment while simultaneously using this map to compute vehicle location ?
    2012-11-30 22:03:54下载
    积分:1
  • xiaobofenjie
    和自回归模型一起写的小波模型,里面用到了自回归,自回归模型已上传(Since the regression model and the wavelet model with writing, which used the autoregressive, autoregressive models have been uploaded)
    2010-05-25 14:57:39下载
    积分:1
  • JSP--E-T--GA
    针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
    2012-04-29 21:39:36下载
    积分:1
  • 696518资源总数
  • 104269会员总数
  • 42今日下载