-
FFDR
等半径泊车方法仿真代码,实现等半径泊车算法的仿真,车辆参数如车长、车宽、转弯半径以及车位参数如长度、宽度均可调。(Simulation code radius ranging from parking way a radius ranging from parking the simulation algorithm, vehicle parameters such as vehicle length, vehicle width, turning radius and parking parameters such as length, width can be adjusted.)
- 2021-03-25 15:39:14下载
- 积分:1
-
wenxian
这是基于matlab的人脸识别英文文献,从别的地方转的.(This is based on face recognition matlab English literature, from somewhere else to turn.)
- 2013-04-18 20:50:31下载
- 积分:1
-
737434a8c47e4bbbb27d8e445b921785
换热站计算及选型,非常有用,里面用的XLS编写的,直接用就可以~~~~~(Calculation and selection of heat transfer stations, very useful, which use XLS written directly on it ~ ~ ~ ~ ~)
- 2014-01-21 09:42:04下载
- 积分:1
-
20084WANGGONG
说明: 2008年4月网工真题.doc 对各位考生有很大的帮助,希望各位考上(April 2008 Network Engineering 真题. Doc candidates of you very helpful, hope you admitted to)
- 2010-04-25 10:31:52下载
- 积分:1
-
201310031112064238
获取全局唯一标识符GUID值的access事例(Get access cases globally unique identifier GUID value)
- 2014-12-26 02:49:43下载
- 积分:1
-
Agasionzationr
Ar气在CO2激光作用下的电离mmatlab程序代码。
(Ar gas effect of CO2 laser ionization mmatlab program code.)
- 2012-08-23 22:20:57下载
- 积分:1
-
lag
如何使用MATLAB编程,里面有详细的说明,大家可以试试。满好的教程(How to use the MATLAB programming, which is described in detail, we can try. Man good tutorial)
- 2007-11-07 09:02:27下载
- 积分:1
-
matlabPcomPVC
vc和matlab混编技术之一:vc++基于com组件调用matlab的dll(One of vc and matlab mixed technology: vc++ DLL based on matlab com component calls
)
- 2013-09-18 15:45:39下载
- 积分:1
-
MatCont
matlab中研究非线性动力学现象程序,倍周期分岔 ,(matlab program in the study of nonlinear dynamical phenomena)
- 2020-11-17 15:59:39下载
- 积分:1
-
pipe
某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
- 2008-07-07 10:25:25下载
- 积分:1