9927416BPwaveletneuralnetwork
wavelet neural network algorithm very useful for matching
- 2010-02-25 13:19:42下载
- 积分:1
-
zhongzhilvbo
MATLAB实现图形图像的处理,对图像的中值滤波。(MATLAB image processing of graphics, the image median filtering.)
- 2011-05-23 17:23:09下载
- 积分:1
-
channel-coding
信道编码和无线电技术的一些MATLAB源代码(MATLAB source code of the channel coding and radio technology)
- 2012-05-30 19:29:51下载
- 积分:1
-
bizhi
基于FFT的比值算法,是用比值法实现的MATLAB程序。
(Based on the ratio of FFT algorithm, is the ratio method using the MATLAB program realize.)
- 2007-08-28 10:35:37下载
- 积分:1
-
finite-element-method
说明: 有限单元法原理与应用(第一版)--b朱伯芳.pdf(Principle and Application of finite element method (first edition)- b CENTRAL SOUTH HIGHWAY. Pdf)
- 2011-04-14 09:34:58下载
- 积分:1
-
Assignment-1-modified-matlab-code-m-files-(Ali)
this code generates random numbers according to different distributions, Gaussian distribution, Rayleigh distribution, Rician and Nakagami, weibull and suzuki model.
- 2013-10-06 22:05:39下载
- 积分:1
-
AdaBoost
使用MATLAB 编程实现的自适应增强分类器的一个具体实例,内含具体程序,并已调试成功(Adaptive Programming using MATLAB enhanced classifier to a specific case that contains specific procedures, and has been successful commissioning)
- 2010-12-03 10:00:40下载
- 积分:1
-
mat
MATLAB编程源码,结果为画出多个正六边形。(MATLAB programming source code, the result is to draw more than regular hexagon.)
- 2011-02-12 09:01:54下载
- 积分:1
-
10.1.1.101.8984
I found this paper regarding to LPR interesting and I would like to share it.
- 2011-02-12 17:35:41下载
- 积分:1
-
Texto-integral
Paper Abstract – An adaptive control of Distributed Generation (DG)
to provide predictable active power output at the primary
distribution substation is described. Often, distribution networks
accommodate renewable energy different energy sources
and thus using different energy conversion sources. As the
amount of generation that comes intermittent renewable
sources (e.g. wind energy) increases, network operators start to
concern with the uncertainty of generation. However, when the
power output intermittent renewable sources is predicted,
the network operators can reduce the operational costs of the
network and the DG owners may go on the market. Thus, our
challenge with this work was to develop an algorithm which can
predict the active power output the aggregation of wind and
biomass energy at the primary distribution substation of a typical
distribution network. Wind and biomass energy plant are onto
the same distribution network but not necessarily onto the same
feeder.
- 2014-12-04 00:36:38下载
- 积分:1