-
LMS
Another source code to simulate LMS adaptation algorithm using Matlab.
- 2010-07-02 02:09:34下载
- 积分:1
-
untitled-(3)
found on the Windows operating system — by far the most common operating system in use today
- 2015-02-17 19:27:14下载
- 积分:1
-
02e7e515a874ecd889000000
ANSYS FE procedures and 3D models for thermal and mechanical simulation of both Laser and TIGwelding
processes are presented
- 2015-03-16 20:23:58下载
- 积分:1
-
Constrained-optimization-problem
有约束最优化问题:利用matlab中已有的函数。举了一个利用里面函数求最小值的例子。这是最优化与运筹学中会经常遇到的问题(Constrained optimization problem: using the matlab existing function. For a use inside function minimise example. This was the optimized and operations research will often encounter problems
)
- 2012-11-13 20:49:52下载
- 积分:1
-
PMSM_DTC
这是永磁同步电机的直接转矩控制,仿真结果表明性能良好,值得大家借鉴。(This is a direct torque control of permanent magnet synchronous motor, the simulation results show good performance, it is worth learning from.)
- 2020-06-30 10:20:01下载
- 积分:1
-
diff_besselj_root
matlab 中求besselj导数的根,可以根据需要,改变输入值得到不同的根
( seek besselj derivative of the root in matlab. you may change the input to found the different answer.)
- 2010-01-29 18:04:29下载
- 积分:1
-
rga
code to test the m imo system for the ML and MZ
- 2011-05-10 18:34:46下载
- 积分:1
-
MATLAB-Programming---David-Kuncicky
matlab programming - Davig Kuniciky
- 2014-10-02 10:32:19下载
- 积分:1
-
rcs_cylinder
radar cross section in radar application
- 2013-04-27 15:44:16下载
- 积分:1
-
moxingyuece3
高速铁路路基沉降是一个复杂的系统过程,涉及不同时期、不同工况,选用单一的预测模型不足以反映路基整体的变形规律.Logistic模型及Verhulst模型的曲线均为S形,可以反映全过程的地基沉降与时间的关系.针对路基填筑期和降水期两个时段利用MATLAB软件编制程序计算模型参数,得到Logistic模型和灰色Verhulst模型,进而求得两者的最优加权组合模型.对比结果表明:在路基填筑期由两者的最优加权组合模型预测得到的结果与实测结果较吻合,拟合精度高于单一模型 而在降水期Verhulst模型的预测值更接近实测值,平均相对误差约为1.75%,拟合精度较高.(High-speed railway subgrade settlement process is a complex system involving different times and in different conditions, the choice of a single forecasting model does not adequately reflect the overall deformation of roadbed. Curve Logistic model and Verhulst models are S-shaped, the whole process can be reflected foundation settlement versus time. against roadbed construction period of two hours and precipitation using MATLAB software programming model parameters, the Logistic model and gray Verhulst model, and then get the optimal model of a weighted combination of the two. comparative results indicate : results and experimental results in the roadbed construction period by the weighted combination of the best of both models predicted than the anastomosis fitting accuracy than a single model precipitation predicted value of Verhulst model closer to the actual value of the average relative error approximately 1.75 fitting accuracy.)
- 2014-01-10 17:30:42下载
- 积分:1