登录
首页 » 电子书 » thinking in java second edition in English

thinking in java second edition in English

于 2022-03-24 发布 文件大小:1.38 MB
0 102
下载积分: 2 下载次数: 1

代码说明:

thinking in java 英文第二版-thinking in java second edition in English

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • “突破邮箱附件大小限制”是一遍文章,它教你如何解决邮件附件大小的限制,...
    “突破邮箱附件大小限制”是一遍文章,它教你如何解决邮件附件大小的限制,- "The breakthrough mailbox appendix size limit" is an article, how does it teach you to solve the mail appendix size limit,
    2023-06-19 01:30:04下载
    积分:1
  • C language
    C语言-从白痴到资深专家阶梯式教程,一本比较不错的C入门书籍!-C language- from the idiot to a senior expert step-by-step tutorials, a relatively good entry-C books!
    2022-07-11 20:06:42下载
    积分:1
  • vc++经典编程(avi)01
    vc++经典编程(avi)01-02-vc classical programming (avi) 01-02
    2022-01-26 03:54:14下载
    积分:1
  • 这本大家应该都知道了的吧
    这本书大家应该都知道了的吧-this book we should all be aware of the unpleasant
    2022-02-24 13:42:47下载
    积分:1
  • javascript 1.5规范,无须解压密码 不错的哦
    javascript 1.5规范,无须解压密码 不错的哦-norms, without extracting passwords oh well
    2022-03-17 07:47:37下载
    积分:1
  • Linux for Embedded and Real
    Linux for Embedded and Real-time Applications
    2022-03-20 16:50:29下载
    积分:1
  • 一本很好的Linux Device Driver
    一本很好的Linux Device Driver-a good Linux Device Driver
    2022-03-23 08:56:58下载
    积分:1
  • as30 detailed examples, including a large number of examples, is a rare good inf...
    as30的详细例子,包含了大量的例子,是不可多得的学习AS3的好资料-as30 detailed examples, including a large number of examples, is a rare good information to learn AS3
    2023-08-09 19:35:14下载
    积分:1
  • Osip开发者手册,是被翻译过的,中文版的,拿来共享一下
    Osip开发者手册,是被翻译过的,中文版的,拿来共享一下-Osip development handbook, have been translated and the Chinese version, brought about sharing
    2022-05-13 19:34:33下载
    积分:1
  • 一家石油公司计划在主管道中建设一个东向西。PIP…
    某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有 n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定 n口油井的位置,即它们的 x 坐标(东西向)和 y 坐标(南北向),应如何确定主管道的最优位置,即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置,使得给定n口油井的位置,编程计算各油井到主管道之间的输油管道最小长度总和。 -An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time in charge of Road to determine the optimal location, making a given n the location of oil wells, programmed to calculate the well-to-charge of Road between the length of the sum of the smallest oil pipeline.
    2022-10-27 02:45:03下载
    积分:1
  • 696518资源总数
  • 104349会员总数
  • 32今日下载