-
DFIG_变流器为电压源_包含轴系模型_先打开坐标库
双馈风机,含轴系模型,变流器简化为受控电压源,记得先打开坐标库。(DFIG. Shaft model included. Converters are simplified as controllable voltage source.)
- 2018-08-14 10:10:13下载
- 积分:1
-
Demo_DFIG
说明: 双馈风力发电机模型,可实现多种情况下的暂态仿真。(Model simulation of doubly fed wind turbine)
- 2020-04-13 22:05:28下载
- 积分:1
-
SVPWM_42版本_请自行Import_注意先打开坐标库
SVPWM模块,出口为六路触发脉冲。适用风电/VSC等。含测试系统。(SVPWM. Outputs: 6 pulses. For PMSG/DFIG/VSC-HVDC... Test system included.)
- 2018-08-14 10:15:14下载
- 积分:1
-
goudianzuixiao
电力系统优化调度是一项复杂的系统工程。目前,在在电力系统发电领域,还没有一个系统的、完善的、成熟的解决方案。研究电力系统中水电厂优化调度,必须考虑到环境的影响,对提高电网安全稳定水平,优化利用能源资源,全方位努力地开拓发电企业的电力市场、提高经济效益等都具有重要意义。(
Study for optimal scheduling of power system Abstract Optimal operation of power system is a complicated systematic project.Currently,there is no systematic, comprehensive, mature solution in the field of power system generation. Study of power system optimal operation of hydropower, must take into account the environmental impact of raising the level of network security and stability, optimal use of energy resources, optimal use of energy resources, Comprehensive efforts to develop power plants in the electricity market, improve economic efficiency are all important..)
- 2020-11-04 22:19:51下载
- 积分:1
-
weiranji
微燃机模型,用于CCHP系统仿真,应用于电力系统(Micro turbine model for CCHP system simulation, applied to power systems)
- 2021-03-30 13:39:10下载
- 积分:1
-
hd
说明: 这是一个PSCAD4.2.1的火电机组模型,容量是660MW。(This is a PSCAD 4.2.1 thermal power unit model with a capacity of 660MW.)
- 2020-02-18 16:08:17下载
- 积分:1
-
090120022
配电网网损计算,前推回代算法,基于分成分区原理(Distribution network loss calculation, forward and backward substitution algorithm is divided into partitions based on the principle)
- 2011-06-06 11:12:26下载
- 积分:1
-
psasp7.0ALL-examples
电力系统综合分析程序PSASP7.0的标准算例,很难找的。只要将相关算例用PSASP打开即可进行相关分析(Power system analysis program PSASP7.0 standard example, it is difficult to find. As long as the relevant example PSASP open to correlation analysis)
- 2021-04-26 09:58:46下载
- 积分:1
-
power_turbine
说明: 本例程通过matlab提供的simulink水轮机程序,做了改动,调整了部分参数,并且增加了借阅,模仿水轮发电机组一次调频过程,值得借鉴(Through the Simulink turbine program provided by matlab, the routine has been changed, some parameters have been adjusted, and borrowing has been added to imitate the primary frequency regulation process of the hydro-generator set. It is worth learning from.)
- 2020-09-09 22:28:07下载
- 积分:1
-
MIP
运用分支定界法求解混合整数线性规划,可用于求解电力系统机组组合问题( solving mixed integer linear programming branch and bound method ,and the program can solve unit commitment problem)
- 2009-05-13 22:57:21下载
- 积分:1