-
PV_VSC_VF
光伏模型
扰动法MPPT
逆变器采用电压-频率控制(Photovoltaic model
P&O method MPPT
The inverter adopts voltage frequency control)
- 2017-07-04 23:19:04下载
- 积分:1
-
circulation
用于计算石油工业中油管内的循环压耗,可以解决石油工业中的有关管路压耗计算的问题。(failed to translate)
- 2009-11-14 15:28:08下载
- 积分:1
-
ganyingdianji
说明: 分别对速度、磁场两个分量进行独立控制。通过控制转子磁链,以转子磁通定向,然后分解定子电流而获得转矩和磁场两个分量,经坐标变换,实现正交或解耦控制(The velocity and magnetic field components are controlled independently. By controlling the rotor flux, the rotor flux is oriented, and then the stator current is decomposed to obtain two components of the torque and magnetic field. Orthogonal or decoupling control is realized by coordinate transformation.)
- 2019-01-25 14:52:53下载
- 积分:1
-
SinWaveGenerator
电力系统仿真建模需要的模型,可以适合智能电网,分布式发电(power system modeling control smart grid stability)
- 2013-09-13 07:10:08下载
- 积分:1
-
SVPWM_永磁风电_带桨距角控制_先打开坐标库
SVPWM, 永磁风电,含有桨距角控制,记得先打开运行库。(SVPWM, PMSG. Pitch control included. Do remember to open the vector library first.)
- 2021-03-18 11:59:20下载
- 积分:1
-
Least-square-deconvolution
最小平方反褶积的相关程序,可用于相关地震资料的处理和分析(Least squares deconvolution procedures, can be used for correlation of seismic data processing and analysis)
- 2013-08-12 21:57:15下载
- 积分:1
-
跟踪中心轨迹内点法最优潮流程序
说明: 跟踪中心轨迹内点法最优潮流程序,适合学习最优潮流计算(Tracking center trajectory point method optimal power flow program)
- 2019-10-31 17:26:39下载
- 积分:1
-
SPP-Imbalance-Market-
报告首先介绍了2011年西南电力库(SPP)的市场业务,包括推动电能不平衡市场的发展,引入优先使用廉价电力机制,监控每个市场参与者的电源/负荷平衡和提高系统可靠性。报告随后介绍了2014年西南电力库的集中市场情况,该集中市场将包括多天的可靠性机组启停过程、包含辅助服务在内的日内市场清算服务以及和辅助服务共同优化的实时平衡过程。随后分析了集中市场和其他市场的区别,以及集中市场的功能。(The report first describes the 2011 Southwest Power Pool (SPP) of the market business, including the promotion of energy imbalance market, the introduction of priority in the use of cheap electric power system, monitoring of each market participant the power/load balancing and improve system reliability. The report then describes the Southwest Power Pool 2014, the concentration of market conditions, the concentration of the market will include a number of days the reliability of the unit commitment process, including support services, including day services and the market clearing and support services to optimize the balance between real-time process. Subsequent analysis of the concentration difference between the market and other markets, and focus on the function of the market.)
- 2011-05-16 11:14:00下载
- 积分:1
-
seisrectime[1]
说明: 地震模型正演程序,特别适合物探专业学生学习。(Seismic forward modeling program, especially for geophysical professional learning.)
- 2011-02-25 08:50:50下载
- 积分:1
-
Large-wind-farms-stability
大型风电场接入电网的稳定性问题研究,希望对大家有点启发( the problems of Large wind farms connected to the grid stability)
- 2013-07-21 17:39:07下载
- 积分:1