-
Essential.MATLAB.for.Engineers.and.Scientists
工程人员必备的matlab参考书,是第四版,被很多人奉为经典。(Essential reference for engineers matlab)
- 2011-01-07 20:21:17下载
- 积分:1
-
Archive
灰色预测的程序,灰色预测是对不确定系统数据的预测(Gray prediction procedure, gray prediction is for uncertain system data)
- 2013-10-11 16:45:17下载
- 积分:1
-
MoM.rar
哈林顿计算电磁场的矩量法教材,很详细,微波专业必看,绝对经典(Calculation of electromagnetic fields Harrington MoM materials, very detailed and professional microwave a must-see, an absolute classic)
- 2008-03-29 17:41:18下载
- 积分:1
-
MATLAB_Simulink
MATLAB_Simulink电力系统建模与仿真_于群
MATLAB_Simulink _ in the group of the modeling and simulation of power system
(MATLAB_Simulink _ in the group of the modeling and simulation of power system
)
- 2016-11-28 22:10:42下载
- 积分:1
-
textzzy.rar
把当前图形窗中已存在的任何字对象拖放到所需的位置;向当前图形窗输入字对象,并拖放到任何所需位置。 (align current graphics window which has been in existence for the drag and drop any object to the word for the position; current graphics to the window object input characters, and drag-and-drop to any required position.)
- 2006-05-20 23:20:44下载
- 积分:1
-
MATLAB_GUI
matlab 新手学习资料,主要讲的是开发GUI(this basic document is for learning MatLab GUI, suitable for the fresh.)
- 2012-05-01 12:02:08下载
- 积分:1
-
BPAdaboost
BPAdaboost,包括主程序,测试集等等(BPAdaboost, including the main program, test sets, etc.)
- 2020-10-21 11:07:24下载
- 积分:1
-
moxingyuece3
高速铁路路基沉降是一个复杂的系统过程,涉及不同时期、不同工况,选用单一的预测模型不足以反映路基整体的变形规律.Logistic模型及Verhulst模型的曲线均为S形,可以反映全过程的地基沉降与时间的关系.针对路基填筑期和降水期两个时段利用MATLAB软件编制程序计算模型参数,得到Logistic模型和灰色Verhulst模型,进而求得两者的最优加权组合模型.对比结果表明:在路基填筑期由两者的最优加权组合模型预测得到的结果与实测结果较吻合,拟合精度高于单一模型 而在降水期Verhulst模型的预测值更接近实测值,平均相对误差约为1.75%,拟合精度较高.(High-speed railway subgrade settlement process is a complex system involving different times and in different conditions, the choice of a single forecasting model does not adequately reflect the overall deformation of roadbed. Curve Logistic model and Verhulst models are S-shaped, the whole process can be reflected foundation settlement versus time. against roadbed construction period of two hours and precipitation using MATLAB software programming model parameters, the Logistic model and gray Verhulst model, and then get the optimal model of a weighted combination of the two. comparative results indicate : results and experimental results in the roadbed construction period by the weighted combination of the best of both models predicted than the anastomosis fitting accuracy than a single model precipitation predicted value of Verhulst model closer to the actual value of the average relative error approximately 1.75 fitting accuracy.)
- 2014-01-10 17:30:42下载
- 积分:1
-
pv1
光伏单项并网控制仿真,包括最大功率点跟踪MPPT(Simulation of single grid-connected photovoltaic control, including MPPT with maximum power point tracking)
- 2018-12-17 20:19:54下载
- 积分:1
-
ABAP_Programming
Manual of ABAP Programming
- 2010-09-15 14:38:30下载
- 积分:1