登录
首页 » Visual C++ » cd

cd

于 2013-10-20 发布 文件大小:3KB
0 119
下载积分: 1 下载次数: 2

代码说明:

  课后题的编程(Most optimized operating)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • BackscatterMap
    雷达影像后向散射系数计算,并绘制后向散射系数图(backscattering coefficients of Radar image, show the figure of backscatter coefficients)
    2021-03-31 15:49:09下载
    积分:1
  • TCCI_2011_edge
    matlab based edge detection method
    2012-05-01 13:17:41下载
    积分:1
  • Fingerprint_Identification_System_Implementation_V
    指纹识别系统VC和matlab实现:包涵VC和matlab实现源码!(Fingerprint Identification System VC and matlab implementation: bear with VC and the matlab implementation source!)
    2010-06-04 08:29:36下载
    积分:1
  • 04
    说明:  一些有关最优控制理论的控制实例程序集和仿真 (Control instance assembly of the optimal control theory and simulation)
    2012-06-11 16:32:38下载
    积分:1
  • VC_and_matlab_mix_code
    VC++与MATLAB的混合编程的快速实现 讨论了如何用MATLAB的complier将*.m函数编译为动态链接库DLL,供VC++使用的方法。(VC++ and MATLAB programming for fast implementation of mixed discuss how to use MATLAB' s complier to*. m functions compiled as dynamic link library DLL, VC++ for the methods used.)
    2010-06-30 15:44:04下载
    积分:1
  • Matlab
    文档介绍了matlab工具箱的使用情况。对于初学者是非常有帮助的。(Document describes the use of matlab toolbox. For beginners it is very helpful.)
    2009-12-13 11:57:45下载
    积分:1
  • EngineMat
    VC调用matlab混合编程 利用matlab引擎(VC call matlab hybrid programming using matlab engine)
    2010-01-06 09:21:04下载
    积分:1
  • A
    说明:  2015全国硕士研究生数学建模题目A:水面舰艇编队防空和信息化战争评估模型(2015 national graduate students mathematical modeling problem A)
    2015-10-12 11:23:43下载
    积分:1
  • pipe
    某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
    2008-07-07 10:25:25下载
    积分:1
  • fuzzysketch
    Fuzzy Extractor Sketch
    2014-01-08 05:18:00下载
    积分:1
  • 696518资源总数
  • 104269会员总数
  • 42今日下载