登录
首页 » C# » WPF

WPF

于 2013-11-18 发布 文件大小:131KB
0 219
下载积分: 1 下载次数: 4

代码说明:

  一种实现matlab和c#结合的小例子,有待进一步改进(An implementation matlab and c# combination small example, be further improved)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • data2dlookup
    simulink 2d 查表程序 table2d.m, data2d.fig, table2dlookup.mdl, data2dresult.fig(simulink 2d look-up table procedure table2d.m, data2d.fig, table2dlookup.mdl, data2dresult.fig)
    2007-09-09 17:35:47下载
    积分:1
  • TVCalculate
    matlab传动系统扭振GUI计算程序,MATLAB7.0版本以上,算法采用了符号运算方式。(GUI drive system torsional vibration matlab program, MATLAB7.0 version of the above, the algorithm uses symbolic algorithms.)
    2009-05-30 08:42:13下载
    积分:1
  • Lyapunov
    说明:  定义法求解Lyapunov指数方法,精度比较低。(Index definition methods of Lyapunov method, the accuracy is relatively low.)
    2009-08-15 20:25:09下载
    积分:1
  • bspderiv
    the above function is useful to find the derivative of a bspline
    2012-01-18 01:08:41下载
    积分:1
  • chicken-eggs-counting
    My package is all about counting chicken eggs in a tray using camera, from image processing to GUI, it supports presenting the present result, past result, and total result
    2014-02-04 04:28:42下载
    积分:1
  • coherence
    对同步采集的同一动作模式下的脑电和信号和肌电信号进行一致性分析(Analysis the coherence between EEG and EMG)
    2013-03-12 19:00:10下载
    积分:1
  • shuxuejianmo_3
    说明:  某厂向用户提供发动机,合同规定,第一、二、三季度末分别交货40台、60台、80台.每季度的生产费用为 (元),其中x是该季生产的台数.若交货后有剩余,可用于下季度交货,但需支付存储费,每台每季度c元.已知工厂每季度最大生产能力为100台,第一季度开始时无存货,设a=50、b=0.2、c=4,问工厂应如何安排生产计划,才能既满足合同又使总费用最低.讨论a、b、c变化对计划的影响,并作出合理的解释(To provide users with a factory engine, contract, first, second and third quarter respectively, delivered at the end of 40, 60, 80. Quarterly cost of production (million), in which x is the quarter of the number of production. If the remaining after delivery, can be used for delivery next quarter, subject to payment of storage fees, for each element c of each quarter. The largest known plant production capacity of each quarter to 100, the beginning of the first quarter of stock, set up a = 50, b = 0.2, c = 4, asked how to arrange the production of the factory plans to meet the total cost of the contract makes the minimum . Discussion of a, b, c of the impact of change on the plan and make a reasonable explanation)
    2009-07-24 22:58:49下载
    积分:1
  • Relating-EbNo-SNR
    理解信噪比、比特能量与噪声能量比的计算方法、及相互关系(Understanding and Relating Eb/No, SNR, and other Power Efficiency Metrics)
    2014-11-05 15:09:42下载
    积分:1
  • cyclic_cross_correlation
    说明:  循环平稳时间序列的循环互相关的matlab程序(Cyclostationary time-series of the cycle of inter-related procedures matlab)
    2008-10-03 20:48:50下载
    积分:1
  • JogoMinoria
    The code was developed to genereate artificial market trajectory. It was also developed in matlab
    2013-01-10 21:59:59下载
    积分:1
  • 696518资源总数
  • 106235会员总数
  • 12今日下载