-
LeastSignificantBit_Embed_Program
说明: DCT域的嵌入程序,可以获得较高的鲁棒性,且嵌入秘密信息后的不可感知性也很好。(DCT embedded procedures, get higher robustness, and secret information embedded in the perception is also not very good.)
- 2006-03-22 12:54:03下载
- 积分:1
-
123
说明: MATLAB和QuartusⅡ的FIR滤波器设计与仿真(MATLAB and the Quartus Ⅱ FIR filter design and simulation of)
- 2011-04-07 14:35:06下载
- 积分:1
-
power_switching_power_supply
Synchronous Buck Converter: This switched power supply converts a 30V DC supply into a regulated 15V DC supply. The model can be used to both size the inductance L and smoothing capacitor C, as well as to design the feedback controller. By selecting between continuous, discrete and fixed-point controllers, the impact of discretization and using limited numerical precision can be explored
- 2014-10-27 17:35:38下载
- 积分:1
-
faceRecognition
这是一个matlab人脸识别程序代码,有GUI界面(This is a face recognition matlab code, there is a GUI interface)
- 2020-11-20 17:49:38下载
- 积分:1
-
mf_var_0-1lzowdx
说明: Mixed frequency vector autoregressive model use in MATLAB2018b
- 2020-10-10 14:07:34下载
- 积分:1
-
vectorcontrol
三相异步电机调速仿真模型,包含变频调速、矢量控制,串电阻调速模型等(Three-phase induction motor simulation , including the Frequency Control, vector control, speed control model series resistor)
- 2009-03-01 21:23:51下载
- 积分:1
-
matlab_examples300
matlab程序300例,帮助学习matlab(matlab program 300 cases to help learning matlab)
- 2008-07-14 17:25:52下载
- 积分:1
-
magic
魔术公式,汽车模型,四轮的,但没有数据,有公式(Magic formula,Car model)
- 2012-05-15 15:24:40下载
- 积分:1
-
power_transfohyst
power_transfohyst,matlab仿真文件,电力电子、功率电子控制方面很有价值,调试通过(aspects of power_transfohyst, matlab simulation files, power electronics, power electronics control valuable debugging through)
- 2013-02-28 14:06:23下载
- 积分:1
-
流水线型车间作业调度问题
流水线型车间作业调度问题可以描述如下:n个任务在流水线上进行m个阶段的加工,每一阶段至少有一台机器且至少有一个阶段存在多台机器,并且同一阶段上各机器的处理性能相同,在每一阶段各任务均要完成一道工序,各任务的每道工序可以在相应阶段上的任意一台机器上加工,已知任务各道工序的处理时间,要求确定所有任务的排序以及每一阶段上机器的分配情况,使得调度指标(一般求Makespan)最小。下面的源码是求解流水线型车间作业调度问题的遗传算法通用MATLAB源码,属于GreenSim团队原创作品,博客上发布的是不完全的源码,本人将其补充完成已成功运行,转载请注明GreenSim团队原创作品。(Pipelined job-shop scheduling problem can be described as follows: n tasks on the assembly line m processing stages, each stage has at least one machine and at least one stage there are multiple machines, and the same processing performance of each machine on the same stage , at every stage to complete each task are a process, each process of each task can be processed on any machine on the corresponding stage of the processing time of each process known tasks, all tasks required to determine the sort and every Distribution of the machine on a stage, making scheduling index (typically seek Makespan) Min. The following code is a Genetic Algorithm for Job Shop Scheduling Problem pipelined general MATLAB source code, original works belong GreenSim team, the blog post is incomplete source code, I will supplement has been successfully completed its operation, please indicate the original team GreenSim works.)
- 2020-10-30 15:19:56下载
- 积分:1