登录
首页 » Pascal » H2

H2

于 2014-12-13 发布 文件大小:6KB
0 146
下载积分: 1 下载次数: 0

代码说明:

说明:  a complete program for calculating of energy of H2 and He by monte carlo simulation

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • explore_matlab
    该书提供了详实的结合,尤为重要的是结合实例(matlab explore)
    2010-07-21 19:48:58下载
    积分:1
  • channel
    信道估计的源程序。可以参考一下,跑得通的(Channel estimation of the source.)
    2009-12-28 20:31:52下载
    积分:1
  • IP_radon_TF
    Radon transfor for medical purposes + computer vision
    2012-02-13 02:12:11下载
    积分:1
  • Simple_2D_SOFM
    som matlab code som matlab code som matlab code
    2009-11-01 11:56:22下载
    积分:1
  • kalman-simulation
    The purpose of this paper is to provide a practical introduction to the discrete Kalman filter. This introduction includes a description and some discussion of the basic discrete Kalman filter, a derivation, description and some discussion of the extended Kalman filter, and a relatively simple (tangible) example with real numbers & results.(The purpose of this paper is to provide a pra ctical introduction to the discrete Kalman fil ter. This introduction includes a description and some discussion of the basic discrete Kalma n filter, a derivation. description and some discussion of the extende d Kalman filter. and a relatively simple (tangible) example wit h real numbers)
    2007-05-24 21:09:31下载
    积分:1
  • optical_tools_matlab2
    matlab中的光学工具,实现光学仿真实例源代码(第二部分)(matlab opyical tool)
    2013-08-23 19:52:15下载
    积分:1
  • sjzym3
    西北工业大学研究生课程,数字信号处理上机作业三(Northwestern Polytechnical University post-graduate courses, digital signal processing, machine operating)
    2013-03-14 13:23:03下载
    积分:1
  • shuxuemoxing
    1,某厂向用户提供发动机,合同规定,第一、二、三季度末分别交货40台、60台、80台.每季度的生产费用为 f=ax+bx^2(元),其中x是该季生产的台数.若交货后有剩余,可用于下季度交货,但需支付存储费,每台每季度c元.已知工厂每季度最大生产能力为100台,第一季度开始时无存货,设a=50、b=0.2、c=4,问工厂应如何安排生产计划,才能既满足合同又使总费用最低. 2,函数的输入为A,B两个矩阵,实现如下功能:从A矩阵中找出与B完全相同的子矩阵,并将该子矩阵左上角的位置保存到2*n的向量index中,最后函数返回A中所有与B完全相同的子矩阵的左上角坐标。(1, a factory to provide users with the engine, the provisions of the contract, first, second and third quarter, respectively Delivery 40 units, 60 units, 80 units. The production cost of each quarter the f = ax+bx ^ 2 ($), where x is the number of Taiwan-quarter production. If after delivery, the surplus can be used for delivery next quarter, but to pay the storage fees, each quarterly c. Factory known each quarter of the maximum production capacity of 100 units of stock in the first quarter, setting a = 50, b = 0.2, c = 4, asked how the factory should arrange production plan, in order to both meet the contract and the lowest total cost of . 2, the function' s input is the two matrices A, B, to achieve the following functions: to identify from the matrix A and B are identical sub-matrix, and a position in the upper-left corner of the sub-matrix is ​ ​ saved to the vector index of 2* n, The last function returns the coordinates of the upper left corner of the sub-matrices A)
    2013-04-14 00:28:15下载
    积分:1
  • vsPmatlab
    vs2010调用matlab.m文件生成的lib,dll,h文件,并进行参数的传递(vs2010 calling matlab.m files generated lib, dll, h file and pass parameters)
    2013-11-27 21:42:54下载
    积分:1
  • cloud-analyze
    基于云模型的评价应用研究,内容详实,有利于建模(Evaluation of applied research based on cloud model, informative, beneficial modeling)
    2013-12-29 22:01:23下载
    积分:1
  • 696518资源总数
  • 104269会员总数
  • 42今日下载