登录
首页 » Java » ClassInstance

ClassInstance

于 2013-11-02 发布 文件大小:1KB
0 89
下载积分: 1 下载次数: 1

代码说明:

  Class Instance Source Code for Andriod.

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • plotimage2
    This code is about plotimaging in seismic data.
    2009-11-14 00:52:28下载
    积分:1
  • simsim_sdm_read
    Cognitive Science SDM code
    2010-03-04 14:07:18下载
    积分:1
  • Matlab-code
    单点定位算法用来仿真无线定位技术,简单可行(Single-point location algorithm is used to simulate wireless location technology simple and feasible)
    2012-06-04 22:14:16下载
    积分:1
  • MyAutoCorr
    本程序是用于信号相关分析的实验程序, 主要功能是计算和比较几种信号的相关函数。(Auto Correlation matlab program)
    2012-06-18 10:57:27下载
    积分:1
  • LS_esprit
    传统的解相干方法主要有空间平滑和子空间拟合两类,但这些方法或者阵列利用率低或者计算复杂度高,因此寻求计算量小且阵列利用率高的解相干测向方法有重要意义.该文基于前后向矢量重构理论,(The traditional decoherence methods spatial smoothing and subspace fitting into two categories, but these methods or array utilization rate is low or high computational complexity and therefore seek small amount of calculation and array of high utilization coherent finding method is important. This paper is based on the vector before and after Reconstruction,)
    2013-05-19 16:26:55下载
    积分:1
  • MultiLineReg.m
    多元线性回归,包含了具体的检验系数和输入输出,很有用(MultiLineRegression)
    2009-04-21 08:30:55下载
    积分:1
  • dbn
    DBN源码,深度学习领域的适合初学者学习的代码之一,基础必备的内容。(DBN source, depth of learning areas for beginners to learn the code, one basic essential content.)
    2021-03-14 23:49:23下载
    积分:1
  • mutipleobjectpso
    pso解决两目标函数极值问题,适合初学多目标的同学(Pso solve two goals for beginners, the function extreme problem multi-objective classmates)
    2010-06-15 21:58:11下载
    积分:1
  • Casteljau
    对控制点的De Casteljau剖分算法(Of the control point De Casteljau Dissection Algorithm)
    2010-02-11 12:10:57下载
    积分:1
  • shuikuidiaodupso
    说明:  水电站中长期优化调度主要是在满足电力系统出力要求以及下游综合用水要求等的前提下,合理地安排水库各个月份的发电流量,使得调度期内的总发电量最大。即在给定预报入库流量过程线、下游综合用水流量过程线、调度期起始水位和终止水位等条件下,通过总水量的合理运用使调度期内水电站的总发电量最大。(Long-term optimal operation of hydropower stations mainly in the power system to meet the output requirements, and integrated water requirements downstream of the premise, reasonable arrangements for generating reservoir flow each month, making the scheduling period, the largest amount of total power generation. That is forecast in a given inflow hydrograph, downstream water discharge hydrograph synthesis, scheduling and termination of the initial water level and water level conditions, the total amount of water through the rational use of the scheduling period, the total generating capacity of the largest hydropower station.)
    2011-03-07 09:40:57下载
    积分:1
  • 696518资源总数
  • 104269会员总数
  • 42今日下载