登录
首页 » matlab » S

S

于 2012-09-01 发布 文件大小:48KB
0 73
下载积分: 1 下载次数: 0

代码说明:

说明:  提取ERP,从matlab的数据文件中提取出脑电数据,并通过输入的信噪比进行滤波,这是第二部分 脑电数据文件(abstract ERP)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • Moments-simulation
    基于矩量法仿真的笼形天线宽带化设计 (Method of Moments simulation cage antenna design is based on broadband)
    2013-11-24 10:15:51下载
    积分:1
  • Lorenz-equation
    采用洛仑兹方程仿真混沌效应,并带入不同参数求解(Lorentz equations using simulation chaotic effect, and bring different parameters to solve)
    2015-03-17 14:54:58下载
    积分:1
  • SEP
    无线传感器网络方面的MATlab代码,很有帮助(WSNs)
    2009-12-04 15:08:15下载
    积分:1
  • spectrogram_example
    说明:  stft的实验小程序,可以做个基础,然后据此展开做些复杂的东西(stft experiments applet)
    2010-03-21 23:42:07下载
    积分:1
  • Chapter5
    用Matlab实现滤波器模型与仿真的功能(Achieved with the Matlab function filter model and simulation)
    2010-06-08 11:39:21下载
    积分:1
  • log_spec_super_gaussV1_1
    Toolbox for log-spectral magnitude MMSE estimators under super-Gaussian densities. (Toolbox for log-spectral magnitude MMSE estimators under super-Gaussian densities.)
    2009-10-05 21:49:51下载
    积分:1
  • motionCtrl
    利用李亚普诺夫直接法和PID算法,分别仿真对差动驱动轮式机器人的控制,使其行走直线或者圆轨迹程序(Using Lyapunov direct method, the control differential drive wheeled mobile robot is walking a straight line or circle track program)
    2009-12-28 10:37:24下载
    积分:1
  • DTT
    Decision Theory Toolbox for matlab
    2011-10-23 13:11:21下载
    积分:1
  • JSP--E-T--GA
    针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
    2012-04-29 21:39:36下载
    积分:1
  • MATLAB_Toolbox
    Matlab toolbox for data analysis
    2012-08-14 14:04:57下载
    积分:1
  • 696518资源总数
  • 104269会员总数
  • 42今日下载