-
Assignment3a
SOurce code for Long window ALgorithm
- 2011-11-28 22:50:26下载
- 积分:1
-
fdtd1D
说明: FDTD一维程序,可以帮助大家建立一维模型,并输入参数运行。比如传输线、同轴线及平面波的设置及模拟都可以采用这个程序解决问题,尤其是给出了边界的设置方法。(FDTD a peacekeeping process, we can help build a dimensional model and input parameters operation. For example, transmission lines, coaxial line and plane wave configuration and simulation can make use of this procedure to solve the problem, especially given the boundary configuration.)
- 2005-11-16 09:24:10下载
- 积分:1
-
Matlab_Program_for_CIE
MATLAB 关于cie的一些程序,对于初学者来说有点用(MATLAB on cie number of procedures, some use for beginners)
- 2013-11-12 17:04:38下载
- 积分:1
-
The-matlab-command
涉及matlab使用过程中经典的命令大全,可以帮助使用者快速操作matlab。(Involved in the the MATLAB process of using classic command Guinness, can help users quickly the operation of Matlab.)
- 2013-04-26 17:32:18下载
- 积分:1
-
NPC3LEV_SPWM
3 level NPC inverter (SPWM)
- 2016-01-20 05:45:35下载
- 积分:1
-
code
毕业论文参考资料,从期刊网上下载的,如果有需要共大家参考(Thesis reference materials downloaded from the journal, if you need a total of reference)
- 2011-05-28 17:05:41下载
- 积分:1
-
zhimutongji
这是用matlab编写的一个统计字母的小程序,爱好matlab的可以下载(This is a statistical letter written in matlab small program, like the matlab download)
- 2011-09-27 19:28:17下载
- 积分:1
-
four-fast-Fourier-transform
通过对基4快速傅里叶的介绍,使用matlab实现了基4快速傅里叶变化(Through the radix-4 Fast Fourier presentation, using matlab to achieve a base four fast Fourier transform)
- 2013-10-30 17:00:07下载
- 积分:1
-
base_band
base_band.rar文件解压后可以在matlab平台直接编译运行,实现通信系统的升余弦基带
成型处理,码元速率,采样率、滚降系数都可以灵活设置,特别方便学习通信的同学加深对基带信号的理解。(base_band.rar unzip the files can directly compile and run matlab platform to achieve communication system raised cosine baseband shaping processing, chip rate, sample rate, roll-off factor can be set flexibly, in particular, to facilitate students to learn to communicate better to the base band signal understanding.)
- 2010-09-07 09:09:19下载
- 积分:1
-
task31
说明: 工序调整:因为实际因素的影响,在任务11开始之前必须先完成任务15,而在任务9(顶部施工)开始到第7周后必须穿插1周时间的安装工作,因而任务10中的“照明系统”工作周数也相应减少1周;(Adjustment process: since the actual factors, the task must be completed 11 missions before the start of 15, while in task 9 (top construction) began to be interspersed 7 weeks 1 week after the installation time, thus the task of 10 in " lighting systems " work week is also a corresponding reduction in the number of 1 week )
- 2010-03-31 10:50:35下载
- 积分:1