登录
首页 » matlab » svm

svm

于 2011-08-11 发布 文件大小:1KB
0 113
下载积分: 1 下载次数: 87

代码说明:

  svm分类器,有几类样本点,利用线性SVM分类器求出其分界面(svm classifier, there are several types of sample points, using a linear SVM classifier obtained the sub-interface)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • Sumapot
    Suma de potencias para calcular campo en el receptor
    2009-10-26 18:07:55下载
    积分:1
  • SUI-xindao
    典型的SUI信道模型,经过验证。。。。。(SUI channel models typical, proven. . . . .)
    2011-05-22 14:24:48下载
    积分:1
  • matlab_pca
    用matlab处理的人脸识别,基于pca算法(Matlab deal with face recognition based on pca algorithm)
    2012-05-04 22:36:01下载
    积分:1
  • WSN
    its a mat lab code for WSN-MAC
    2013-10-22 10:01:42下载
    积分:1
  • C4
    This code is related to the course Digital Communications. It simulates a communication system which uses AWGN and 16QAM
    2013-11-10 02:32:33下载
    积分:1
  • 123
    Kerr的经典著作,短波电波电波传播理论。(Kerr, theory of short wave radio wave propagation .)
    2013-12-20 23:54:04下载
    积分:1
  • classic-epidemic-model
    传染病经典模型si,sis,sir编程以及其图像和实现(Classic model of infectious diseases si, sis, Sir Programming and its image and implementation)
    2013-12-15 11:23:54下载
    积分:1
  • LCLsingle_ok
    matlab7.1,光伏LCL型接法并网模型仿真,测试通过(matlab7.1,solar energy inverter with LCL filter model simulation)
    2020-07-02 09:40:02下载
    积分:1
  • 3zuoye
    某市有一码头,每次仅容一辆船停泊装卸货,由于经常有船等候进港,部分人提出要扩建码头。经过调查历史资料发现,码头平均每月停船24艘,每艘船的停泊时间为24±20小时,相邻两艘船的到达时间间隔为30±15小时,如果一艘船因有船在港而等候1小时,其消耗成本为1000元。经预算,扩建码头大约需要1350万元,故市长决策如下:如果未来五年内停泊船只因等候的成本消耗总和超过扩建码头花费则扩建码头,否则,不予扩建。因此,希望你能够帮助市长做出决策。此问题已知到达的大概时间和大概停泊时间,对于此问题用概率统计的方法来做比较复杂,可用程序随机产生到达时间和停泊时间来模拟未来五年内船的停泊,多次模拟预测停泊情况,以做出决策(。-Problem in a city with a terminal expansion dock, each only allow a boat moored loading and unloading, as often there are waiting boat into port, some people proposed to expand pier. Terminal stopping 24 per month, per vessel berthing time of 24 ± 20 hours, the arrival of two adjacent vessels interval 30 ± 15 hours, if a ship due to boat in the harbor while waiting for one hour, and its consumption cost of 1,000 yuan. The budget of about 13.5 million yuan expansion dock, so the mayor decision as follows: If a ship is moored next five years, the cost of waiting more than the sum of consumption spending is expanding marina pier extension, otherwise, not expanded.)
    2015-04-17 18:59:46下载
    积分:1
  • shipinxinhaofenbu
    利用matlab对信号进行时频分析,信号重排处理,不妨看一看(using Matlab to signal time-frequency analysis, signal processing rearrangement, we might look at the)
    2007-06-26 11:24:43下载
    积分:1
  • 696518资源总数
  • 104349会员总数
  • 32今日下载