-
ml_t3
t3 is a program to show machine learning in matlab
- 2010-08-12 14:04:29下载
- 积分:1
-
WaterFilling_alg
说明: 通信系统功率分配--基于SVD分解的注水算法仿真(Communication system power distribution- filling algorithm based on SVD decomposition simulation)
- 2011-02-27 23:29:15下载
- 积分:1
-
attnc.m
是一些matlab程序,MATLAB_netcdf_20101222matlab_netCDF_OPeNDAmatlab_netCDF_OPeNDAPget_dods_dds.m(studying MATLAB_netcdf_20101222matlab_netCDF_OPeNDAmatlab_netCDF_OPeNDAPget_dods_dds.m)
- 2011-09-24 12:18:34下载
- 积分:1
-
C4.5
Quinlan的决策树程序C4.5(M语言编写)(the program for decision tree C4.5 purposed by Quinlan )
- 2011-12-23 21:08:30下载
- 积分:1
-
径向平均功率谱
说明: 计算二维数据的径向平均功率谱,较好地展现了磁异常的径向变化(calculate the frequency of 2-dimenation data)
- 2020-12-08 13:39:21下载
- 积分:1
-
OptimMatlab
a Use full guide to Solving Optimization Problems using the Matlab Optimization Toolbox
- 2011-07-02 17:14:22下载
- 积分:1
-
filter
滤波器的源码, 用于稀疏傅里叶变换的滤波器的源代码,方法简单易行。(Source filter for sparse Fourier transform filter source code, the method is simple.)
- 2015-01-16 20:11:37下载
- 积分:1
-
Bi-level-programming-model-of-Matlab
双层规划模型的遗传算法求解的Matlab源码(Bi-level programming model of the genetic algorithm of Matlab source)
- 2011-08-18 19:35:58下载
- 积分:1
-
SAR-program
关于合成孔径雷达点目标仿真的小文章,其中包括具体的matlab程序,简单明了。(Synthetic aperture radar on a small point target simulation of the article, including specific matlab program, plain and simple.)
- 2011-11-01 09:12:11下载
- 积分:1
-
moxingyuece3
高速铁路路基沉降是一个复杂的系统过程,涉及不同时期、不同工况,选用单一的预测模型不足以反映路基整体的变形规律.Logistic模型及Verhulst模型的曲线均为S形,可以反映全过程的地基沉降与时间的关系.针对路基填筑期和降水期两个时段利用MATLAB软件编制程序计算模型参数,得到Logistic模型和灰色Verhulst模型,进而求得两者的最优加权组合模型.对比结果表明:在路基填筑期由两者的最优加权组合模型预测得到的结果与实测结果较吻合,拟合精度高于单一模型 而在降水期Verhulst模型的预测值更接近实测值,平均相对误差约为1.75%,拟合精度较高.(High-speed railway subgrade settlement process is a complex system involving different times and in different conditions, the choice of a single forecasting model does not adequately reflect the overall deformation of roadbed. Curve Logistic model and Verhulst models are S-shaped, the whole process can be reflected foundation settlement versus time. against roadbed construction period of two hours and precipitation using MATLAB software programming model parameters, the Logistic model and gray Verhulst model, and then get the optimal model of a weighted combination of the two. comparative results indicate : results and experimental results in the roadbed construction period by the weighted combination of the best of both models predicted than the anastomosis fitting accuracy than a single model precipitation predicted value of Verhulst model closer to the actual value of the average relative error approximately 1.75 fitting accuracy.)
- 2014-01-10 17:30:42下载
- 积分:1