-
gaussian
it is useful to generate gaussian random process...... which is the most requirred at the time of simulation.
- 2010-05-23 11:03:22下载
- 积分:1
-
@queue
一个实现有限队列的matlab程序,采用面向对象的编程方法。(A realization of the limited queue matlab procedures, the use of object-oriented programming methods.)
- 2007-04-19 16:09:13下载
- 积分:1
-
EKF-SLAM-16.0
本包讲解的是关于扩展卡尔曼滤波同时定位与见图的MATLAB仿真代码(This package explains the MATLAB simulation code for simultaneous Kalman filtering simultaneous positioning and reference.)
- 2019-04-02 21:34:26下载
- 积分:1
-
多智能体蜂拥模型 MultiAgent-Flocking-framework-master
多智能体蜂拥模型,可选择不同的期望间隔,并录有仿真视频(The multi-agent swarm model can select different expectation intervals and record simulation videos.)
- 2021-03-30 13:59:09下载
- 积分:1
-
fdp5final
Face Detection System
Face Detection using gabor feature extraction and neural networks
(Face Detection System Face Detection using gabor feature extraction and neural networks)
- 2007-12-05 17:50:39下载
- 积分:1
-
GUI
快速入门MATLAB下的GUI用户界面设计,最适宜新手使用(Under the Quick Start MATLAB GUI user interface design, the most appropriate use for novice)
- 2011-05-12 16:35:22下载
- 积分:1
-
00050001344
Smith Nguyen Studio. Smith Nguyen eBooks. Smith Nguyen Studio. Smith Nguyen eBooks. Smith Nguyen Studio. Smith Nguyen eBooks.
- 2013-07-24 16:43:44下载
- 积分:1
-
D_and_tao_and_omiga
计算高斯伪谱法中的高斯点和微分矩阵,比较慢,求改进(GPM differentiation matrix and Gauss point)
- 2011-10-27 20:39:48下载
- 积分:1
-
moxingyuece3
高速铁路路基沉降是一个复杂的系统过程,涉及不同时期、不同工况,选用单一的预测模型不足以反映路基整体的变形规律.Logistic模型及Verhulst模型的曲线均为S形,可以反映全过程的地基沉降与时间的关系.针对路基填筑期和降水期两个时段利用MATLAB软件编制程序计算模型参数,得到Logistic模型和灰色Verhulst模型,进而求得两者的最优加权组合模型.对比结果表明:在路基填筑期由两者的最优加权组合模型预测得到的结果与实测结果较吻合,拟合精度高于单一模型 而在降水期Verhulst模型的预测值更接近实测值,平均相对误差约为1.75%,拟合精度较高.(High-speed railway subgrade settlement process is a complex system involving different times and in different conditions, the choice of a single forecasting model does not adequately reflect the overall deformation of roadbed. Curve Logistic model and Verhulst models are S-shaped, the whole process can be reflected foundation settlement versus time. against roadbed construction period of two hours and precipitation using MATLAB software programming model parameters, the Logistic model and gray Verhulst model, and then get the optimal model of a weighted combination of the two. comparative results indicate : results and experimental results in the roadbed construction period by the weighted combination of the best of both models predicted than the anastomosis fitting accuracy than a single model precipitation predicted value of Verhulst model closer to the actual value of the average relative error approximately 1.75 fitting accuracy.)
- 2014-01-10 17:30:42下载
- 积分:1
-
matlab_files
here is the matlab files for image array processing
- 2011-06-12 19:09:30下载
- 积分:1