登录
首页 » TEXT » visual99.ps

visual99.ps

于 2012-04-02 发布 文件大小:265KB
0 122
下载积分: 1 下载次数: 3

代码说明:

  paper file from the tool box of some matlab code

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • math4
    matlab经典算法之绘图,PPT讲义可对照程序进行学习(classical algorithm matlab graphics, PPT handouts control procedures may be learning)
    2009-01-15 12:15:08下载
    积分:1
  • EQ
    说明:  自己在MATLAB GUIDE下编写的数字均衡器。能播放WAV格式音频文件并进行8段均衡器调节,显示原波形、频谱和调节后的波形、频谱。压缩文件中还包含了3个可以参考的类似程序报告。(An EQ designed in MATLAB GUIDE. It can play WAV file and do the EQ, show the frequency spectrum and wave shape of original and filtered file.)
    2013-01-15 22:20:08下载
    积分:1
  • P91_ODE_TaylorSeriesMethod
    Ordinary differential equation of method Taylor series method.
    2014-10-15 17:46:44下载
    积分:1
  • hbaapi
    FC HBA API的接口实现,这个实现可以满足很多做光纤卡的app级应用开发。(FC HBAAPI implementation )
    2013-12-31 09:13:41下载
    积分:1
  • pm
    PM system payment e-voucher automatic.
    2014-01-12 03:44:48下载
    积分:1
  • IEEE33DG
    IEEE33节点含DG遗传算法,简单实用,适合初学者学习,可用于配电网重构(Genetic algorithms, simple and practical, suitable for beginners to learn, can be used for distribution network reconfiguration)
    2020-11-06 15:09:49下载
    积分:1
  • signal
    说明:  matlab 数字信号处理工具箱 含有非常完整的信号处理函数(signal_processing)
    2010-04-01 23:39:30下载
    积分:1
  • AM
    说明:  这是关于AM调制的matlab程序,对初学调制的人很有帮助,有仿真图片(AM modulation matlab program, beginner modulation helpful, simulation picture)
    2020-12-04 15:09:24下载
    积分:1
  • isar
    包络对齐和相位补偿算法,用于逆合成孔径雷达成像(range alignment and phase compensation tools for ISAR imaging processing)
    2021-04-21 16:38:49下载
    积分:1
  • JSP--E-T--GA
    针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
    2012-04-29 21:39:36下载
    积分:1
  • 696518资源总数
  • 104349会员总数
  • 32今日下载