-
fuzzytb
模糊逻辑控制最经典的教程,内容全面,适用于广大战友学习(Fuzzy Logic Control of course the most classic, comprehensive study and apply to the majority of his comrades)
- 2009-05-14 03:33:38下载
- 积分:1
-
ModeledMachine
四模块永磁轮毂电机的容错控制策略的仿真,使用的是矢量控制的策略。(Permanent magnet synchronous motor using two-phase four-leg vector control simulation, on the basis of the platform can simulate the four-module permanent magnet wheel motor fault tolerance, including speed, torque ripple.)
- 2021-02-25 16:49:38下载
- 积分:1
-
TSP
TSP问题模拟退火算法的matlab源程序(The TSP simulated annealing algorithm matlab source)
- 2012-09-07 16:32:57下载
- 积分:1
-
3weishange222
本程序利用matlab实现3维栅格地图建模,调试成功,有兴趣的可以下载(This procedure using matlab to achieve a three-dimensional grid map modeling, debugging success, interested can download)
- 2013-04-12 18:58:18下载
- 积分:1
-
dvb
说明: 关于DVBT的OFDM发送和接受部分的MATLAB代码。(On the OFDM DVBT send and receive part of the MATLAB code.)
- 2010-04-03 13:28:35下载
- 积分:1
-
ofdm-simulation
ofdm仿真程序,包括信号产生,传输,接受,和解调(ofdm simulation)
- 2011-06-28 08:32:15下载
- 积分:1
-
Using-SeDuMi-1.02.-A-Matlab-toolbox-
Using SeDuMi 1.02. A Matlab toolbox for optimization over symmetric cones
- 2011-10-25 21:40:50下载
- 积分:1
-
moxingyuece3
高速铁路路基沉降是一个复杂的系统过程,涉及不同时期、不同工况,选用单一的预测模型不足以反映路基整体的变形规律.Logistic模型及Verhulst模型的曲线均为S形,可以反映全过程的地基沉降与时间的关系.针对路基填筑期和降水期两个时段利用MATLAB软件编制程序计算模型参数,得到Logistic模型和灰色Verhulst模型,进而求得两者的最优加权组合模型.对比结果表明:在路基填筑期由两者的最优加权组合模型预测得到的结果与实测结果较吻合,拟合精度高于单一模型 而在降水期Verhulst模型的预测值更接近实测值,平均相对误差约为1.75%,拟合精度较高.(High-speed railway subgrade settlement process is a complex system involving different times and in different conditions, the choice of a single forecasting model does not adequately reflect the overall deformation of roadbed. Curve Logistic model and Verhulst models are S-shaped, the whole process can be reflected foundation settlement versus time. against roadbed construction period of two hours and precipitation using MATLAB software programming model parameters, the Logistic model and gray Verhulst model, and then get the optimal model of a weighted combination of the two. comparative results indicate : results and experimental results in the roadbed construction period by the weighted combination of the best of both models predicted than the anastomosis fitting accuracy than a single model precipitation predicted value of Verhulst model closer to the actual value of the average relative error approximately 1.75 fitting accuracy.)
- 2014-01-10 17:30:42下载
- 积分:1
-
Buck_Boost_converter_DC_to_DC
Buck Boost converter Bidirectional DC/DC for application charging and discharging of battery
- 2014-06-22 07:11:18下载
- 积分:1
-
HHT
希尔伯特黄变换,绘制IMF,边缘谱图,自己正在调试,中间些错误,待修正。(Yellow Hilbert transformation and draw the IMF, edge chart, you are debugging, among some mistakes, to be fixed.
)
- 2012-04-08 23:15:21下载
- 积分:1