登录
首页 » matlab » untitled

untitled

于 2012-06-01 发布 文件大小:8KB
0 99
下载积分: 1 下载次数: 101

代码说明:

  基于matlab的质子交换燃料电池动态过程电压,电流仿真模型(Dynamic process of the fuel cell voltage, current simulation models matlab proton exchange)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • mtetris
    用matlab编的俄罗斯方块程序,偶然发现的,编的很有趣(Tetris series with the matlab program, by chance discovered a very interesting series)
    2010-07-29 22:00:46下载
    积分:1
  • pls_matlab
    偏最小二乘法的算法介绍以及matlab程序例子(Partial least squares algorithm, and matlab program examples introduced)
    2010-09-30 16:13:51下载
    积分:1
  • Bluetooth_matlab
    说明:  蓝牙跳频通信系统的Simulink仿真实现(Bluetooth frequency hopping communication system of Simulink Simulation)
    2010-04-26 20:27:30下载
    积分:1
  • fenjieyigeyaun
    说明:  在matlab环境下生成一个正方形中心嵌套一个圆,并利用curvelet变换显示出其各个子层的系数图,良好的体现了curvelet变换的各向异性的性质。(In the matlab environment to generate a nested square center of a circle, and the use of curvelet transform shows that its coefficient of sublayer maps, a good reflection of the curvelet transform the nature of the anisotropy.)
    2009-04-13 19:48:04下载
    积分:1
  • liftwave
    提升法97经典程序此程序是矩阵实现,所以图像水平分量和垂直分量估计被交换位置 为了保证正交,所有边界处理,全部采用循环处理(upgrade classic procedures of this process is to achieve matrix, So images of horizontal component and the vertical component is estimated to be exchanged orthogonal position to ensure that all borders, the use of cycles)
    2006-10-15 09:43:51下载
    积分:1
  • fuzzy-neural-network
    对模糊神经网络的应用,通过嘉陵江水质的检测,利用模糊系统测出水质性能(The application of fuzzy neural network)
    2012-06-28 21:07:54下载
    积分:1
  • JSP--E-T--GA
    针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
    2012-04-29 21:39:36下载
    积分:1
  • 1
    说明:  元胞自动机的例子,细胞生长法完成初始化,然后计算晶粒的生长,入门级别程序(Examples of cellular automata, cell growth method to initialize, and then calculate the grain growth, entry-level program)
    2011-11-10 09:37:46下载
    积分:1
  • PAPER1
    The Finite State MAC with Cooperative Encoders and Delayed CSI
    2015-02-24 13:27:35下载
    积分:1
  • complex_method_wiens_0_03
    复形调优算法,,本算法是改进型算法,它在全局范围内寻找最优点,收敛效果好且快(Complex tuning algorithms, the algorithm is modified algorithm, the scope of its global search for the most advantage of faster convergence and better)
    2009-06-19 20:50:01下载
    积分:1
  • 696522资源总数
  • 104042会员总数
  • 46今日下载